I started my blog in June 2016, intending to have a place to get my stories in the hands of readers. I started with one follower -- my wife. I post a daily quote, as well as short stories and vignettes. Alas, current events pull my attention and I've added current events to the mix. You can find my Tavern Tales at: https://jjshaun.com/ Enjoy! |
What a week. Read the full post and check out the latest pictures at: http://jjshaun.com/2023/10/29/rebuilding-the-dream-pt-158/ |
This has been a stressful week. We’ve reached the inspection stage of the project. The inspectors discovered a few minor issues and two major ones. One of the major issues is the need to rebuild the basement staircase. We caught one inspector as he was leaving the property a few days ago, and he verified a few things for us regarding the temporary Certificate of Occupancy. It was good to hear some good news for a change. Read the full post and see pictures at: http://jjshaun.com/2023/10/22/rebuilding-the-dream-pt-157/ |
This week was a sh!t-show. Read the full story and see the pictures at: http://jjshaun.com/2023/10/08/rebuilding-the-dream-pt-154/ |
Now it’s happening. The plumber has almost completed his piece of the construction puzzle. He’s waiting on a part to complete the system, then we’ll be able to open the water valves and see if any leaks occur. With luck, the plumbing will be ready for inspection late in the week. 🤞🏼 Pictures are at: http://jjshaun.com/2023/10/01/rebuilding-the-dream-pt-153/ |
This past week saw more progress on the basement level. The downstairs level saw progress as they put in the slider and added treads to the stairs. However, we need to return three of the windows for manufacturing defects. See the pictures at: http://jjshaun.com/2023/09/24/rebuilding-the-dream-pt-152/ |
We have visible progress on the house. Read the full blog and check out the pictures at: http://jjshaun.com/2023/09/17/rebuilding-the-dream-pt-151/ |
The house has been sitting on the foundation for sixty-three days. Tomorrow, Mr. Sub-Contractor will begin installing the basement windows and siding. Read the full blog and check out pictures at: http://jjshaun.com/2023/09/10/rebuilding-the-dream-pt-150/ |
Earlier this week, we met with Mr. Sub-Contractor to discuss stairs, windows, siding, decks, and the basement door. Our original idea was to have a wrap-around deck, but with the cost of materials right now, that won’t happen. Read the full post here: https://jjshaun.com/2023/07/23/rebuilding-the-dream-pt-145/ |
Our new house is finally in place. That does not mean it went off without a hitch, however. We had plenty of excitement on house-moving day. Read the full post (complete with pictures) here: https://jjshaun.com/2023/07/16/rebuilding-the-dream-pt-144/ |
And so it began, 990 days after we lost our home. Finally. Despite the rainy forecast, the company decided that now is the time to move our house. Read the full post here: https://jjshaun.com/2023/07/09/rebuilding-the-dream-pt-143/ |